Turnkey project of the new Delfin headquarter and refurbishment of the existing industrial building.
The structure is made of steel prefab profiles and it’s been assembled on site thanks to the implementation of high resistance junctions.
Internally, you can find a total of seven calendered columns measuring 10 meters each. Leaning on the columns there’s a glass façade built with the spider-glass system.
The existing buildings have been covered by a black perforated laminated metal sheet.
DELFIN HEADQUARTER